The Project is situated 110km east of Mwanza, Tanzania's second city and close to the Tanzanian road network that connects to the ports of Dar es Salaam and Tanga. A major powerline is 20km from the Project and cogeneration will be available from the acid plant. Heavy fuel oil is also a possible alternative. The Project will draw its water from either Lake Victoria, 25km away, or from a borehole system. The limestone reagent will be sourced locally in Tanzania, while the sulphur will be imported.

 